1 paper
| title: | Two-beam operation of the 1.5 GeV electron-positron storage ring Adone |
| format: | unknown |
| year: | 1969 |
| 17 authors: | | | | | | | | | | | | | | | | | |
| abstract: | Two-beam operation has recently been successfully achieved at Adone, the 1.5 GeV electron-positron storage ring of the Laboratori Nazionali di Frascati del CNEN the first results, which are in good agreement with the design aim, are reported. Measurements of the luminosity (defined as the interaction rate in a crossing region for an event having unit cross-section) have been performed observing the interaction rate of events with known cross-section (e+ e- single bremsstrahlung and e+ e- scattering at small angles). The luminosity has also been computed from beam currents and transverse dimensions. |
| keywords: | |
| | details | edit | delete | |